Based on 1000 Reviews

Average

4.8

(1000 Reviews)
5 Star
894
4 Star
2
3 Star
80
2 Star
17
1 Star
7
  • user2

    Dissatisfaction post-assembly and missing elements

    Dissatisfaction sets in as I reflect on the post-assembly phase of the trampoline. The anticipation of gifting a delightful recreational escape was marred by a challenging assembly process, aggravated by the discovery of missing elements. This post-utilization discontentment taints the initial excitement of the purchase.